php
Methodology
Methodology due date Friday 01/06 2
Extraneous Variables (and plan for how controlled).
Instruments: Description, validity, and reliability estimates, which have been performed (on a pre-established measure). Include plans for testing validity and reliability of generating your own instrument(s).
Description of the Intervention
Data Collection Procedures